Factory Affordable Price 250MVA 370MVA 220KV 330KV 750KV Distribution Oil-Immersed Type Transformer
Technical Specifications
Rated Capacity
Voltage Ratio
Vector Group
No-load Losses(kw)
Impedance
30kva
380v/3kv/6kv/11kv/33kv
Dyn11/Yd11/Yyno
0.1
4%
50kva
380v/3kv/6kv/11kv/33kv
Dyn11/Yd11/Yyno
0.13
4%
100kva
380v/3kv/6kv/11kv/33kv
Dyn11/Yd11/Yyno
0.2
4%
200kva
380v/3kv/6kv/11kv/33kv
Dyn11/Yd11/Yyno
0.34
4%
315kva
380v/3kv/6kv/11kv/33kv
Dyn11/Yd11/Yyno
0.42
4%
500kva
380v/3kv/6kv/11kv/33kv
Dyn11/Yd11/Yyno
0.6
4%
1000kva
380v/3kv/6kv/11kv/33kv
Dyn11/Yd11/Yyno
1.15
4.5%
1250kva
6kv/11kv/33kv
Dyn11/Yd11/Yyno
-
4.5%
2500kva
11kv/33kv
Dyn11/Yd11/Yyno
2.3
-
4000kva
11kv/33kv
Dyn11/Yd11/Yyno
2.8
-
10mva
11kv/33kv/69kv/110kv
Dyn11/Yd11/Yyno
-
-
40mva
11kv/33kv/69kv/110kv
Dyn11/Yd11/Yyno
-
-
100mva
11kv/33kv/69kv/110kv/220kv
Dyn11/Yd11/Yyno
-
-
Product Showcase
Frequently Asked Questions
Q1: Why choose our transformer solutions?
We have a strong R&D team with over 16 years of transformer design experience. We are familiar with international standards such as IEC, IEEE/ANSI, and CSA, ensuring excellent quality and stable performance with the best cost efficiency.
Q2: Can I visit the production facility?
Sure, we warmly welcome your visit. Please contact our sales representative first by email or phone to make an appointment and arrange the most efficient transportation planning.
Q3: What is your minimum order quantity (MOQ)?
We offer very low MOQ for common items. For customized transformer solutions, the MOQ depends on your specific technical requirements.
Q4: What types of transformers are available?
Our range includes 400V~220kV Oil-immersed Power Transformers, Dry-type Transformers, Unpacked H Grade Dry Transformers, Pad-mounted Transformers, and Oil-immersed Distribution Transformers.
Q5: Do you offer customized OEM/ODM services?
Yes, both OEM and ODM services are available. Please share your specific ideas or technical requirements, and our engineering team will create the perfect solution for you.
Q6: How long is the typical delivery time?
Generally, mass production takes 15-30 days after the sample is confirmed and the formal purchase order or deposit is received.